[1]
2024. Budget-Constrained Linear Utility Maximization and the Hurwicz (1951) Criterion. Systems Assessment and Engineering Management. 1, (Apr. 2024), 34–44. DOI:https://doi.org/10.61356/j.saem.2024.1259.