[1]
“Budget-Constrained Linear Utility Maximization and the Hurwicz (1951) Criterion”, Syst. Assess. Eng. Manage., vol. 1, pp. 34–44, Apr. 2024, doi: 10.61356/j.saem.2024.1259.